happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
Railing_spec_detail.png
Railing spec detail60 viewsShastadad
IMG_2122.JPG
master bedroom, small window60 viewsShastadad
IMG_2147.JPG
master deck from below60 viewsShastadad
_______0192_resize.jpg
60 viewsShastadad
SDC14770_resize.JPG
60 viewsShastadad
2001_Elevations.jpg
60 viewssplitlid
IMG_1511.jpg
Still Digging Septics60 viewsThe septic chambers will each be about 2 meters deep and accommodate 6 round 1.2 m cement pieces. dozer
IMG_1505.jpg
Inbound Water Test60 viewsDuring the inbound water pressure test the only place one should see any moisture is at the lids if they haven't be glued in place. dozer
IMG_1531.jpg
PVC Pipe Lids60 viewsAll PVC piping is covered to prevent concrete or other blockage from getting in it. Also the covers allow the inbound lines to be pressure tested. dozer
IMG_1896.jpg
Cementing the Shower Floor60 viewsLaying concrete in the shower floor area. Notice the rebar mesh in the other shower floor area. dozer
IMG_2864.jpg
Above Screen Section60 viewsScreen section above the ceiling. dozer
IMG_2703.jpg
Door Hinge60 viewsAttaching the door hinges to a sold wood door. 4 hinges are used to prevent any sagging. dozer
7141 files on 596 page(s) 313

Debug Info 
Debug Output: show / hide