Top of Archway62 viewsNotice that top of the archway is being done in red bricks. Also note the vertical lengths of rebar spaced evenly and affixed to the box section at the top as a supporting framework for the archway structure. dozer
|
|
Septics after Pour62 viewsThe service openings are placed to be level with the walkway. dozer
|
|
Gate Rail62 viewsThe rail for the gate is laid in place The rail must run level and equidistant from the wall to ensure easy opening and closing of the gate. The rail will be concreted into place. It is strip of 1.5 inch angle steel with a 12 mm round steel rod welded on top. Two sets of two large 4 inch wheels (total of 4) with an indentation will be affixed to the lower edge of the gate, the wheels are grooved to run along the rod. dozer
|
|
Painting Door Trim62 viewsThe door frame being painted. The sides are properly masked prior to painting. dozer
|
|
Counter Prep for Granite62 viewsThe counter is being prepped for laying in the granite slabs. dozer
|
|
Tile Cutters62 viewsTile cutters make a smoother cut than a grinder but are often not used in other projects.dozer
|
|
62 viewsThe external bathroom footing with the rebar footing pad in place. dozer
|
|
62 viewsThe footing for the bathroom. The ground beam will be on top of this.dozer
|
|
|
|
|
|