happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
Photo-0056.jpg
railing in flat black62 viewsShastadad
_______0194_resize.jpg
wood flooring for stairs and bedrooms62 viewsShastadad
IMG_1520.jpg
Shower Enclosure Beam62 viewsA ground beam is set up to be poured where the shower enclosure will go. dozer
IMG_1556.jpg
Drain Pipes / Inbound Water62 viewsAll of the PVC piping is wired into place prior to setting in concrete to prevent it from angling during the pour. dozer
IMG_2251.jpg
Vented Roof Tile62 viewsThe vented roof tile with plastic covering. The top will be cut for the stainless vents to go through and silicone sealed. dozer
IMG_3010.jpg
Vented Toilet Elbow62 viewsShowing a vented toilet elbow as to be used in both bathrooms. The vent hole in this case is 6 hun (large than 1 inch smaller that 1.5 inches) but can be purchased in various sizes. Venting important to prevent slow flowing toilets. dozer
IMG_2530.jpg
Aluminum Rail Framework62 viewsInstalling the rail framework. The rails are run to form sections to support the smart board ceiling sections. The suspended framework is supported by aluminum strips affixed to the roof structure. dozer
DSCN0439.jpg
Upper Strap Connection62 viewsThe aluminum strap attaches to the tile batten or the roof structure. These strap type attachers are always better than wire. 1 commentsdozer
DSCN0441.jpg
Lower Strap Connection62 viewsThe strap used to hold the ceiling frame in place. dozer
IMG_2705.jpg
Window Frame62 viewsA view of the window frame. There are two tracks, one for the screen and one for the window.dozer
DSCN0479.jpg
Entry Room62 viewsThe entry room. Most of the house was tiled with super glossy granito tiles as in this room.dozer
IMG_9058.jpg
Archway, Left Section62 viewsA view of all three of the archways.dozer
7141 files on 596 page(s) 305

Debug Info 
Debug Output: show / hide