Most viewed |
Wood Trim being Applied64 viewsWood trim being applied to the corner section of the tiered ceiling. Glue is applied to the underside of the trim prior to nailing in place via an air gun. dozer
|
|
Slab put in Place64 viewsHere the granite slab is set into place. The holes and edges are cut at the stone factory. The sinks were used by the factory to guarantee a perfect opening for the under mount sinks. The faucet holes will be drilled on site.dozer
|
|
Colored Render Applied to Patio Edges64 viewsA colored render is being applied to the patio edges. This will look at lot better than paint and matches nicely with the coloration of the tiles.dozer
|
|
|
|
|
|
The start of the formwork for the ground beams63 viewschangnoi
|
|
Caprort entrance looking out63 viewschangnoi
|
|
looking along the main road63 viewsthe fence posts were removed by the seller of the landMax&Bee-in-CM
|
|
levelling the soil63 viewsthe soil was compacted by 20 cm, we had wanted 50 cm but after the tractor was done, it ended up being 30 cm or so.Max&Bee-in-CM
|
|
dumping soil63 viewseach truck costs 350 baht, but we ordered 1.5 rai to a height of 50 cm, for a total cost of 70,000 baht.Max&Bee-in-CM
|
|