happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
IMG_9440.jpg
Wood Trim being Applied64 viewsWood trim being applied to the corner section of the tiered ceiling. Glue is applied to the underside of the trim prior to nailing in place via an air gun. dozer
IMG_9402.jpg
Slab put in Place64 viewsHere the granite slab is set into place. The holes and edges are cut at the stone factory. The sinks were used by the factory to guarantee a perfect opening for the under mount sinks. The faucet holes will be drilled on site.dozer
IMG_9726.jpg
Colored Render Applied to Patio Edges64 viewsA colored render is being applied to the patio edges. This will look at lot better than paint and matches nicely with the coloration of the tiles.dozer
House7.jpg
64 viewsjvjessen
P1000186.jpg
64 viewsthailazer
072Carport_28Custom29.JPG
64 viewspklongball
Land3.jpg
Land 363 viewsLand looking Eastmtsinternational
Form_work_starting2.jpg
The start of the formwork for the ground beams63 viewschangnoi
carport_entrance.jpg
Caprort entrance looking out63 viewschangnoi
IMG_3941.JPG
looking along the main road63 viewsthe fence posts were removed by the seller of the landMax&Bee-in-CM
IMG_2805.JPG
levelling the soil63 viewsthe soil was compacted by 20 cm, we had wanted 50 cm but after the tractor was done, it ended up being 30 cm or so.Max&Bee-in-CM
IMG_2802.JPG
dumping soil63 viewseach truck costs 350 baht, but we ordered 1.5 rai to a height of 50 cm, for a total cost of 70,000 baht.Max&Bee-in-CM
7141 files on 596 page(s) 299

Debug Info 
Debug Output: show / hide