 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
IMG_2139.JPG
master deck tile64 viewsShastadad
SDC11976_resize.JPG
finished first room64 viewsShastadad
SDC14772_resize.JPG
I think that this is the true color of the cabinets64 viewsShastadad
first_sketch_of_225m.jpg
First Sketch64 viewsnanbuilder
IMG_2497.jpg
Flexi Conduit64 viewsThis white conduit comes is nice for running wires to recessed lighting. dozer
IMG_1875.jpg
Septic Covers64 viewsScraping the bronze septic lids after the concrete walkway pour. dozer
DSCN0505.jpg
Sliding Aluminum Window64 viewsThere are three tracks, one for the screen (inside) and two for the window sections. dozer
DSCN0493.jpg
Storage Unit Inside64 viewsAnother view of the storage/utility room with metal racks currently used for storage. dozer
IMG_9215.jpg
Poured Underground Water Tank64 viewsThe poured underground water tank. The wall thickness is 15 centimeters. The dimensions are about 2.5 meters x .70 meter width by 1 meter depth. dozer
IMG_9171.jpg
Framed and Poured External Walls64 viewsAfter the floor pour is completed, the framework as seen is installed and the external walls are poured to a thickness of 15 centimeters. dozer
IMG_9629.jpg
Sloped Bathroom Floors64 viewsThe bathroom floors are sloped to allow water run off towards the drain pipe (shown on the left of the solids drain pipe). dozer
IMG_9317.jpg
Painting the Patio Ceiling64 viewsThe patio ceiling is made of the water resistant drywall plasterboard. Here a primer coat is being applied. dozer