SDC13227_resize.JPG
roof tile on66 viewsShastadad
IMG_1694.jpeg
View of South boundary wall from outside66 viewsShastadad
SDC13228_resize28229.JPG
workers on roof66 viewsShastadad
p_33592.jpg
steel posts for railing66 viewsShastadad
IMG_2179.JPG
windows master bedroom66 viewsShastadad
IMG_1837.jpg
Destination for the Main Panel66 viewsThe main electric control panel will be fitted above these lengths of electric conduit.dozer
IMG_2157.jpg
Underground Electric Conduit66 viewsThe underground electric conduit as it runs in a trench. dozer
IMG_3193.jpg
TV Satillite Routing Cable66 viewsThe external box which holds the RG6 cable routing. There are two cables coming in and 4 cables going out to feed the various TV connections. This splitter is powered (it is unplugged in the picture).dozer
IMG_1833.jpg
Preliminary Layout of Septic Access66 viewsAfter this we vented the septics and change the access lids to the 6" heavy duty type. dozer
IMG_1858.jpg
6" Septic PVC Access and Lid66 viewsThe 6" Septic PVC access lid is covered in preparation for the walkway pour. Note the 6 hun vent pipe extending from the septic. It will be vented up through the wall and roof with the other vent pipes from the project. dozer
IMG_1881.jpg
Rough Bathroom Layouts66 viewsThe drain pipes for the floor drains are 3 inch, toilets are 4 inch, sinks are 1.5 inch. The purpose of the internal formwork is to later pour the shower floors since they will be a lower level. dozer
IMG_1783.jpg
Paint Track66 viewsA paint tray used to be able to dip the structural steel tubing into the primer paint.dozer