View of South boundary wall from outside66 viewsShastadad
|
|
|
|
|

Destination for the Main Panel66 viewsThe main electric control panel will be fitted above these lengths of electric conduit.dozer
|
|

Underground Electric Conduit66 viewsThe underground electric conduit as it runs in a trench. dozer
|
|

TV Satillite Routing Cable66 viewsThe external box which holds the RG6 cable routing. There are two cables coming in and 4 cables going out to feed the various TV connections. This splitter is powered (it is unplugged in the picture).dozer
|
|

Preliminary Layout of Septic Access66 viewsAfter this we vented the septics and change the access lids to the 6" heavy duty type. dozer
|
|

6" Septic PVC Access and Lid66 viewsThe 6" Septic PVC access lid is covered in preparation for the walkway pour. Note the 6 hun vent pipe extending from the septic. It will be vented up through the wall and roof with the other vent pipes from the project. dozer
|
|

Rough Bathroom Layouts66 viewsThe drain pipes for the floor drains are 3 inch, toilets are 4 inch, sinks are 1.5 inch. The purpose of the internal formwork is to later pour the shower floors since they will be a lower level. dozer
|
|

Paint Track66 viewsA paint tray used to be able to dip the structural steel tubing into the primer paint.dozer
|
|