13_-_Master_Bath_-_060608.JPG
390 viewsMaster bathroom sink counter before sink, drawers and doors are installedRick B
CIMG1640.jpg
Front View - All Rendering Complete390 viewsDrDave
IMG_2065.JPG
12/22/2006 13:10389 viewsInstalling drawers.1 commentstcth
IMG_0645.JPG
The process have started389 viewstrehanse
38A_-_Stairs_-_091908.JPG
388 viewsStaircase finishedRick B
IMG_4196.JPG
Interior Wall use of Plumb Bob388 viewsA plumb bob is used to set a vertical line for the interior walls that will be brought 'true' during the render application. Straight lines are use vertically and horizontally.dozer
DSC02235_-_Living_Room_Front_Window_-_022108.JPG
Living Room Front Window386 viewsThis window frame will have four opening windows and a non-opening glass center.Rick B
37_-_Inner_Staircase_-_062608.JPG
386 viewsWooden stairs being installedRick B
IMG_3542.JPG
CPAC Pour of Ground Beams386 viewsCPAC ready mix cement pour of ground beams. 280 KSC (kilometers per square centimeter) concrete was used as in the floor. CPAC is better than hand mix for large areas since it is poured as a homogeneous unit.
dozer
bTicino_modules~0.jpg
bTicino modules385 viewsJust some of the many modules available for the bTicino range.L to R: rocker switch (28 baht) ; 2-pole socket for round (40 baht) and/or flat pin plugs; coax TV cable (60 baht) ; RJ11 telephone socket (142 baht).jazzman
0014_-_Driving_Piles_-_110307.JPG
385 viewsDriving 7m long piles for the house footers. A total of 32 piles were driven for the house, which has a first floor foot print of 17.3m x 16.1m. Rick B
DSC02052_-_Raising_Final_Columns_-_112307.JPG
385 viewsAll columns for the house are now raised.Rick B