|
Most viewed |
|
lady digging a hole for footing67 viewslady at work, in europ we would use an excavater or at least a guy to fix the jobsjeng
|
|
footings67 views23 more to gosjeng
|
|
8 May67 viewsToday we had a delivery of the tile for the main bath, main floors and front balcony.pklongball
|
|
8 May67 viewsToday we had a delivery of the tile for the main bath, main floors and front balcony. We have Mrs PK and the delivery man checking the quantity and type of tile delivered. She has been a great manager for our team.pklongball
|
|
18 May67 viewsMore of the tile application to the back veranda floorpklongball
|
|
June 2367 viewsTile man 2 mixing up a batch of the sand wash for the side walkway.pklongball
|
|
June 3067 viewsSparky wiring the front column lightspklongball
|
|
Painted Soffit looks much better67 viewschangnoi
|
|
|
All columns done67 viewsAll the foundations and columns have been poured and are drying.Max&Bee-in-CM
|
|
We thought it was finished, but were we in for a shock!67 viewsMax&Bee-in-CM
|
|
7141 files on 596 page(s) |
|
|
|
|
|
284 | |
|
|
|
|
|
|
|