Rough Plumbing Layout69 viewsAll of the inbound water pipes (1/2") and drain pipes ready for water pressure test. dozer
|
|

Bathroom Layout69 viewsBathroom nearing readiness to have the floors poured. The main floor will be poured first and then later the shower floors will be poured as they are at a lower level. dozer
|
|

Kitchen Counter69 viewsRebar meshing in the counter is laid in a 10 centimeter square mesh. Concrete will be poured in the forms to make the counter. There will be a place holder for the sink and faucet (on the right). dozer
|
|

Counter after Pour69 viewsThe bathroom counter after the pour. The faucet will set off to the right side of the sink where the PVC pipe is. dozer
|
|

69 viewsThe base rebar (4 hun full) is placed on top of a gravel sub footing. The stick represents the middle of the foundation post which is to be poured. dozer
|
|

69 viewsThe foundation post holes are 1 meter square and 1 meter deep. For this house there are 15 foundation posts.dozer
|
|
|
|

testing68 viewstyger is testing the quality of the rebar, dont cheat me again he thinkssjeng
|
|

30 May68 viewsThe front step area that is being prepared for the concrete walk way.pklongball
|
|

From the left looking back across the site68 viewschangnoi
|
|

Left Alleyway Showing Formwork68 viewschangnoi
|
|