IMG_2926.JPG
drilling the hole69 viewsthe hole was drilled to 60 metres, at a cost of 36,000 baht.
it took about 3 days start to finish for the job.
Max&Bee-in-CM
DSC_0865.jpg
69 viewsrucus7
june32010a2.jpg
standard steel concrete const69 viewswe priced steel vs wood framing steel was 38k vs wood at 56k tbat so i opted steel cement
not as astetic as wood but am sure termitus etus lessus z cement/steel
otis-a
IMG_4437.JPG
Carying another column rebar69 viewsMax&Bee-in-CM
IMG_6721.JPG
First beam attached69 viewsMax&Bee-in-CM
IMG_0460.JPG
Roofer at work69 viewsMax&Bee-in-CM
p_in_3d_rev6_3_resize.jpg
69 viewsfredlk
SDC12072_resize.JPG
Water piped to site69 viewsShastadad
SDC12307_resize.JPG
69 viewsShastadad
SDC12343_resize.JPG
the second story support columns formed69 viewsShastadad
SDC12391_resize.JPG
piping merge point69 viewsShastadad
SDC12887_resize.JPG
big load69 viewsShastadad
7141 files on 596 page(s) 278

Debug Info 
Debug Output: show / hide