|
Most viewed |

27 May71 viewsHere is a more distant side view showing the new paint schemepklongball
|
|

June 771 viewsHere the tile crew is working their magic on the sand wash on the back steps. pklongball
|
|

June 2271 viewsInside of the walk in gate area showing the gray plastic conduits for the lightspklongball
|
|

June 2871 viewsMrs PK starting a dig. I hope she finds a pot of goldpklongball
|
|

Unloading the materials.71 viewsFirst stach of materials arrive 10th October, now we have something to work with. But I think a bit of digging is going to happen first to get those holeschangnoi
|
|

Preparing Mum's ensuite bathroom cabinet71 viewschangnoi
|
|

Digging footings71 viewsBackhoe being use for 34 footingsrucus7
|
|

main switch71 viewsour electricity man installed the master switch on our poleMax&Bee-in-CM
|
|

Rebar for foundation beams71 viewsLots of work coming up twisting, cutting and attaching.Max&Bee-in-CM
|
|

1st floor pour71 viewsbttom flor pouredotis-a
|
|

House in limbo71 viewsWork on the concrete floor, walls, tiles cannot continue as we do repairs to the roof metalMax&Bee-in-CM
|
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
272 |  |
 |
 |
 |
|

|
|
|