IMG_8995.jpg
Squaring Off the Window Openings72 viewsThe window and door openings are squared off after being initially roughly finished. It is after this process that they will be the correct size and position. dozer
IMG_9573.jpg
White Aluminum Window Frames72 viewsThe windows opening are measured and the frames are then installed to fit. This is the more expensive 1.2 mm thick white aluminum. Note that most installations do not use the frame piece, which adds to the durability + is a decorative addition.dozer
DSC00075~0.jpg
72 viewsThe cement is poured to anchor the base in place. The depth of this pour is around 20 cm. After this there will be a pour up to ground level which is 60 centimeters wide. Form wood is used as support for this pour.dozer
P1000738.jpg
72 viewsthailazer
IMG_2319.JPG
This is what happens when you don't control the contractor72 viewsShastadad
Dec212010_1.jpg
Dec 21 2010 172 viewsWall work.fgrossiii
IMG_4282.JPG
one of the many plants selected to complement house build72 viewsShastadad
IMG_4333.JPG
pergola uprights72 viewsShastadad
11032301.JPG
Nearly finished72 viewsKlondyke
P5082208.JPG
8 May71 viewsSome of the many bags of mortar mix being used. The amount of cement and cement products used in one build is staggering.pklongball
P5202257.JPG
20 May71 viewsThis is one of the paint crew and he was painting the wood trim with a primerpklongball
P5232280.JPG
23 May 200971 viewsThe readied trim boxes that await their final place on the upper outer ceiling area of the verandapklongball