happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
IMG_4085.JPG
Bogged Down76 viewsThe big truck got bogged down in the soft soil. He had to really rev the engine and spin the wheels to get out.Max&Bee-in-CM
IMG_4320.JPG
Rebuilding worker house76 viewsThe worker's house had to be removed to make room for soil infill, then rebuilt again.Max&Bee-in-CM
IMG_4201.JPG
Wet soil76 viewsRainy season has started, so the new soil is muddy and slippery.Max&Bee-in-CM
IMG_4189.JPG
Soil trucks76 viewsHaving a rest at the end of a long day.Max&Bee-in-CM
IMG_4435.JPG
Supporting the columns76 viewsWooden frames are used to support the columnsMax&Bee-in-CM
08192010099b.jpg
more on drainage issue76 viewsotis-a
IMG_0430.JPG
Half the right side and back done in a day76 viewsMax&Bee-in-CM
IMG_0570.JPG
Space foil insulation under the tiles76 viewsMax&Bee-in-CM
DSCF4898_resize.jpg
Footing in place, supported on clay bricks to allow concrete to flow arround the pad. Pad overall dimension 1.5m x 1.5m steel cage dimension 1.3m x 1.3 m.76 viewsI had to complete the first stages of the construction quickly so decided to use the conceret pipes to form the below grade section of the columns. This allows backfilling of the footing as soon as the concrete had hardened and avoided the need to construct wooden forms.chiyman
SDC12260_resize.JPG
76 viewsShastadad
Photo-0043.jpg
TV wall roof from master deck76 viewsShastadad
P1000456.jpg
76 viewsthailazer
7141 files on 596 page(s) 259

Debug Info 
Debug Output: show / hide