|
Most viewed |
Bogged Down76 viewsThe big truck got bogged down in the soft soil. He had to really rev the engine and spin the wheels to get out.Max&Bee-in-CM
|
|
Rebuilding worker house76 viewsThe worker's house had to be removed to make room for soil infill, then rebuilt again.Max&Bee-in-CM
|
|
Wet soil76 viewsRainy season has started, so the new soil is muddy and slippery.Max&Bee-in-CM
|
|
Soil trucks76 viewsHaving a rest at the end of a long day.Max&Bee-in-CM
|
|
Supporting the columns76 viewsWooden frames are used to support the columnsMax&Bee-in-CM
|
|
more on drainage issue76 viewsotis-a
|
|
|
|
Footing in place, supported on clay bricks to allow concrete to flow arround the pad. Pad overall dimension 1.5m x 1.5m steel cage dimension 1.3m x 1.3 m.76 viewsI had to complete the first stages of the construction quickly so decided to use the conceret pipes to form the below grade section of the columns. This allows backfilling of the footing as soon as the concrete had hardened and avoided the need to construct wooden forms.chiyman
|
|
|
TV wall roof from master deck76 viewsShastadad
|
|
|
7141 files on 596 page(s) |
|
|
|
|
|
259 | |
|
|
|
|
|
|
|