happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
p_in_3d_rev6_10_resize.jpg
78 viewsfredlk
SDC12055_resize.JPG
First cemet footer casings revealed78 viewsShastadad
IMG_1654.jpeg
78 viewsShastadad
Lock_Cefiro_103.jpeg
Ciefero locking mechanism78 viewsShastadad
rebar_base_beams.JPG
Rebar for ground beams main house78 viewsMaseratimartin
Makro_day.JPG
Makro day78 viewsThe holes for the 36 footings are happening....Maseratimartin
IMG_1506.jpg
Partially Dug Septic78 viewsThe seepage tanks here will be 1.2 m wide cement rounds with an exterior of stone aggregate. dozer
IMG_2263.jpg
Orange Flexi Tubing78 viewsThe orange flexi tubing works great for hot water plumbing. With the fittings at over 100 b and the per meter cost at about 100 b it is normally not selected or used in most projects except those with the owner directly buying the materials. dozer
DSCN0463.jpg
PVC Roof Venting78 viewsThe 3/4" PVC roof venting which vents the toilets, sinks and drain pipes. On top of this the septics are also vented, but venting the other appliances helps prevent vacuums and subsequently poor water flow. dozer
IMG_1826.jpg
Attic Walkway78 viewsThis allows for easier access to the attic area. Created from two parallel steel tubing beams with C section rib supports and 20mm grade A plywood as the walkway. dozer
IMG_8732.jpg
Slump Test78 viewsHere is the slump test being performed by a CPAC QA engineer. If the slump is 12 to 14 centimeters the concrete is dryish, 15-17 the concrete is normal and 18 + the concrete is watery. Although 12 to 14 is a bit harder to work it is a stronger and more desirable product to be used in the flooring and ground beam. Workers often prefer 18 + as it is easier to work, without regard to the strength characteristics of the concrete. dozer
P1000708~0.jpg
78 viewsthailazer
7141 files on 596 page(s) 255

Debug Info 
Debug Output: show / hide