IMG_8776.jpg
External True Line79 viewsAn external true line is used to indicate the target external edge of the to be poured columns. This line should square up the same as the initial check did. dozer
DSC00091~0.jpg
79 viewsThe size of the footing of the house depends on many factors. For this house 20 inches is used. (05-Mar-04)dozer
Dec202010_18.jpg
Dec 20 2010 1879 viewsWielding work on the roof beams.fgrossiii
IMG_4247.JPG
79 viewsShastadad
IMG_4316.JPG
79 viewsShastadad
IMG_4345.JPG
79 viewsShastadad
Ban_Chang_Land_Access_Road,_July_06_(Medium).JPG
Sub Soi Entrance to MTSINTERNATIONAL Land78 viewsmtsinternational
P5182229.JPG
18 May78 viewsThe tilemen have moved out to the back veranda over the weekend and have most of the floor done now on Mondaypklongball
P5182238.JPG
18 May78 viewsThis is the coil of wire used as the pulling wirepklongball
P6072365.JPG
June 778 viewsMore of the crew adding the sand wash to the rear stepspklongball
IMG_2725.JPG
Electricity Pole78 viewsFirst thing is we need power, so the electricity truck installs a pole. (cost = 3000 B)Max&Bee-in-CM
IMG_4093.JPG
Lunch Time78 viewsOne of the Myanmar workers gathers grass to make fried vegetables.Max&Bee-in-CM