|
Most viewed |
|
|
MB tile pic , shower exterior wall80 viewsShastadad
|
|
Double cement block construction80 viewsAmaZe
|
|
Nylon String for Column Layout80 viewsA nice heavy nylon string to be used in setting up the site layout (location of each column) which works better than the invisible fishing line commonly used. dozer
|
|
Control Room80 viewsThe control room for the CCTV system and LAN. Each box accommodates 3 RG6 cables and there are boxes for the CAT5 internet cable plus electric. dozer
|
|
Fixing Roof Level80 viewsAny areas of the roof that are 'slightly out of shape' as declared by the roofing engineer must be rectified by welding in a 1 by 1 inch riser to correct the level of the roof batten.dozer
|
|
Side Walkway and Garden80 viewsThe 2m wide side walkway and garden area with 3 small tower type garden lights.dozer
|
|
Video Walkthrough80 viewsA quick video walk though of the project a while after completion. dozer
|
|
Entertainment Area80 viewsThe wall facing the bathroom is designed for a TV viewing area. A bookshelf could alternatively be placed on the right of the TV adjacent to the dividing wall to take advantage of the column which is thicker from the adjoining wall.dozer
|
|
Freshly Poured Floor80 viewsThe poured and leveled floor. dozer
|
|
Vibrator avoids Voids in the Concrete80 viewsA vibrator is necessary to avoid voids in the final product. When the vibrator is applied to the concrete you will see the area around the vibration compact and sink quickly. dozer
|
|
7141 files on 596 page(s) |
|
|
|
|
|
250 | |
|
|
|
|
|
|
|