|
Most viewed |
|
|
|
8 May81 viewsAn over head shot of the small bathroom and the now almost finished wall tiles. We decided today to add one more row on the top to make the ceiling a little higher. Finished height will be 2.75 meters.pklongball
|
|
18 May81 viewsHere we have a below ground level shot of the pipe trenchpklongball
|
|
20 May81 viewsAnother angle of the tile in the bedroompklongball
|
|
23 May 200981 viewsMore of the trimwork for the veranda.pklongball
|
|
June 1281 viewsWe decided to install a rain gutter to the roof line around the read veranda. Huge amounts of rain came off this roof and down the long valley. It is stainless steel and has been painted with a primer so we can match the trim colorpklongball
|
|
Builders Start to Make Camp, I get Message I'm A Grandad & Trouble with the relies81 viewsSo today 28th September I got a text from my son telling us that baby had arrived 1 week early !!! Little Mikayla my new grand-daughter and all before I'm 50. Builders turned up to erect their accomodation, a minor squirmish ensued with a disgruntled relative which mean twe had to race back from the Udon before blood was spilt. All was resolved as was the minor attempt at trying to dupe the farang over costs and all was well in the world again.
changnoi
|
|
Bore hole81 viewsdrilling for water 80' feetrucus7
|
|
81 viewsridge columns formed and pouredrucus7
|
|
Foundations dry81 viewsFoundations and columns are dry, waiting for the macro to back fill soil.Max&Bee-in-CM
|
|
7141 files on 596 page(s) |
|
|
|
|
|
246 | |
|
|
|
|
|
|
|