white pine unfinished82 viewswhite pine unfinishedthaimic
|
|
Downstairs Bathroom / Shower82 viewsDownstairs bathroom / Shower.verticalift
|
|
Workers house side view82 viewsOur electricity pole in the foreground. Later when we dig holes for the fence, we will put some concrete around the pole, currently its only dug in.Max&Bee-in-CM
|
|
Running power82 viewsElectricity poles on the land are quickly setup to run power to the different work zonesMax&Bee-in-CM
|
|
|
Rocks82 viewsThr rock pile that is used to line the bottom of the foundation holesMax&Bee-in-CM
|
|
Foundations flooded82 viewsHave to wait until it dries to continueMax&Bee-in-CM
|
|
|
Gable Vent82 viewsThe gable vent is installed. dozer
|
|
Door Frame82 viewsA vertical beam will be poured on either side of the door frame. The nail seen extruding from the frame is used as an anchor. It will become embedded in the poured vertical beam and lock the frame in place. dozer
|
|
Patio Getting There82 viewsA view of the site at this late stage. Chaos started to subside.dozer
|
|
|