happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
081210g.jpg
view better pic83 viewsenjoyotis-a
IMG_0823.JPG
Jacking up the cross joints83 viewsAll the cross connects/joints in the metal structure were jacked up to level as the trusses were made and welded into place.Max&Bee-in-CM
IMG_1101.JPG
The T support beam holding up the roof at the top83 viewsMax&Bee-in-CM
DSCF5046.JPG
Finishing the first floor slab concrete83 viewschiyman
H2S158_house.jpg
Front83 viewsMrRee
p_in_3d_rev6_15_resize.jpg
83 viewsfredlk
IMG_2051.jpg
Kitchen Electric83 viewsElectrics for kitchen lighting above and below the cabinets along with a switch box and two receptacle boxes. dozer
IMG_2223.jpg
Electric Running to Main Circuit83 viewsWhere the main electric control box will be. dozer
IMG_1995.jpg
Wood in Rafters83 viewsHard wood is fitted in the end of the rafters to be used as a surface to install the fascia board. dozer
IMG_4297.jpg
Applying a Primer83 viewsA good quality primer paint is used, TOA type for fresh concrete finishes (they have two types of primers, one for fresh concrete, the other for existing).dozer
IMG_8954.jpg
PVC Door Supports83 viewsThe PVC door for the bathroom will deform easily. Therefore supports must be added to ensure that during the pouring of the vertical beams or the lintel that the door frame doesn't bend.dozer
MSams-0089.jpg
Spacers in Preparation for Column Pour83 viewsSpacers are applied to the outside of the column frame so that the frame will remain centered within the form wood during the pour. dozer
7141 files on 596 page(s) 243

Debug Info 
Debug Output: show / hide