|
Most viewed |
view better pic83 viewsenjoyotis-a
|
|
Jacking up the cross joints83 viewsAll the cross connects/joints in the metal structure were jacked up to level as the trusses were made and welded into place.Max&Bee-in-CM
|
|
The T support beam holding up the roof at the top83 viewsMax&Bee-in-CM
|
|
Finishing the first floor slab concrete83 viewschiyman
|
|
|
|
Kitchen Electric83 viewsElectrics for kitchen lighting above and below the cabinets along with a switch box and two receptacle boxes. dozer
|
|
Electric Running to Main Circuit83 viewsWhere the main electric control box will be. dozer
|
|
Wood in Rafters83 viewsHard wood is fitted in the end of the rafters to be used as a surface to install the fascia board. dozer
|
|
Applying a Primer83 viewsA good quality primer paint is used, TOA type for fresh concrete finishes (they have two types of primers, one for fresh concrete, the other for existing).dozer
|
|
PVC Door Supports83 viewsThe PVC door for the bathroom will deform easily. Therefore supports must be added to ensure that during the pouring of the vertical beams or the lintel that the door frame doesn't bend.dozer
|
|
Spacers in Preparation for Column Pour83 viewsSpacers are applied to the outside of the column frame so that the frame will remain centered within the form wood during the pour. dozer
|
|
7141 files on 596 page(s) |
|
|
|
|
|
243 | |
|
|
|
|
|
|
|