Construction Photos
Most viewed
Consumer_Unit_Medium.jpg
Consumer Unit medium440 viewsConsumer Unit (pre equipped), steel box, for 4 circuits, eg; Lighting, wall sockets, water heater, air con.
Brand: Safe-T-Cut
Equipment: 2-pole 32A master, minature RCBO with variable senitivity, 2 16A MCBs, 2 10A MCBs
Price: about 1,800 baht
jazzman
Door_knobs.JPG
Locking door knobs438 viewsStandard Thai style locking doors knobs. These cost 250 baht from HomePro. There are cheaper ones, and I have seen cheaper ones installed in multi-million luxury homes in developments on Samui.jazzman
DSC02066_-_Rebar___Forms_Lower_Foundation_-_112707.JPG
436 viewsColumns have been poured from the footer up to just below the first floor elevated beams. Rebar for beam to hold wall surrounding the crawl space is also being assembled.Rick B
krisidacondo.jpg
Condo Layout435 viewsThe condo is appx. 120 sq meters or 1290 sq feet. The entry way opens into a kitchen area which then continues to a sitting area with a entertainment center. Then on to the balcony (shown in blue). There is a hallway to each of the large bedrooms. The master opens up to the main balcony, the guest room has a small balcony. Each bedroom has it's own bathroom2 commentsMsDozer
new_IMG_0811.jpg
435 viewstrehanse
DSC02118_-_First_Floor_Foundation_-_122107.JPG
435 viewsRebar and forms for the first floor beams are ready for the concrete pour. The top of the first floor is 115cm above grade to minimize problems should there ever be flooding.Rick B
ridge_tile.JPG
Ridge Tile435 viewsSee how they go together in the next pic. they cost 50 baht each.jazzman
Day_1_marking_out.jpg
Day 1. Setting up434 viewsThe first day was spent setting up the shed, the site electrics and lighting, organising the tools, the cement mixer, and the portable scaffolding, clearing the plot and marking out with pegs and orange string. We bought the cement mixer a couple of years ago second-hand for 5,000 baht. In it, we use the spare 3 Kw motor from the rice-mill. It's reasonably transportable on the back of a pick-up.jazzman
DSC02190_-_Wall_Next_To_Stairs_-_020908.JPG
Interior Walls Starting433 viewsStarting to lay block for the interior walls. Staircase to the second floor is behind worker and will eventually be covered with wooden steps.Rick B
34_-_Thai_Kitchen_North_Counter_-_051908.JPG
432 viewsOutside thai kitchen counter being pouredRick B
IMG_0657.JPG
Painting the steel431 viewstrehanse
DSC02151_-_First_Floor_Columns_-_122807.JPG
429 viewsFirst floor columns are being fitted with formsRick B