June 1485 viewsHere we have today's view into the master bath and the shower zone with the built in bench added for sitting down and enjoying a relaxing shower. A shower unit will be installed near this benchpklongball
|
|

June 1585 viewsHere we have the master bath vanity about 60%. pklongball
|
|

June 2685 viewsBack veranda with part of the railing in place and stainedpklongball
|
|

June 2685 viewsLooking down the front steps toward the newly sand washed walk way and the side yardpklongball
|
|

June 2885 viewsDirt man and Mrs talking over what we want done.pklongball
|
|

A column pit85 viewsOne of the pits prior to the column going in. Interesting the different layers of soil and there colours.changnoi
|
|

Column rebar85 viewsMaking the internal rebar for the columnsMax&Bee-in-CM
|
|

Columns positioned85 viewsThe rebar columns are positioned for the concrete pour.Max&Bee-in-CM
|
|

Levelling the concrete85 viewsThe worker directing the concrete pour and leveling the concrete.Max&Bee-in-CM
|
|

Metal shuttering85 viewsWe rented metal shuttering for the columns. Cost = 3,650 baht for a few weeks.Max&Bee-in-CM
|
|

Laundry85 viewsThe rebar for the ground beams of the laundryMax&Bee-in-CM
|
|

Master bedroom85 viewsThe rebar ground beams for the master bedroom on the left, looking at the front of the house.Max&Bee-in-CM
|
|