June 1485 viewsHere we have today's view into the master bath and the shower zone with the built in bench added for sitting down and enjoying a relaxing shower. A shower unit will be installed near this benchpklongball
P6152430.JPG
June 1585 viewsHere we have the master bath vanity about 60%. pklongball
P6262480.JPG
June 2685 viewsBack veranda with part of the railing in place and stainedpklongball
P6262490.JPG
June 2685 viewsLooking down the front steps toward the newly sand washed walk way and the side yardpklongball
P6282541.JPG
June 2885 viewsDirt man and Mrs talking over what we want done.pklongball
IMG_0072.JPG
A column pit85 viewsOne of the pits prior to the column going in. Interesting the different layers of soil and there colours.changnoi
IMG_3791.JPG
Column rebar85 viewsMaking the internal rebar for the columnsMax&Bee-in-CM
IMG_4419.JPG
Columns positioned85 viewsThe rebar columns are positioned for the concrete pour.Max&Bee-in-CM
IMG_4434.JPG
Levelling the concrete85 viewsThe worker directing the concrete pour and leveling the concrete.Max&Bee-in-CM
IMG_4474.JPG
Metal shuttering85 viewsWe rented metal shuttering for the columns. Cost = 3,650 baht for a few weeks.Max&Bee-in-CM
IMG_5070.JPG
Laundry85 viewsThe rebar for the ground beams of the laundryMax&Bee-in-CM
IMG_5067.JPG
Master bedroom85 viewsThe rebar ground beams for the master bedroom on the left, looking at the front of the house.Max&Bee-in-CM