IMG_1721.jpg
Spacers applied to Edge of Rebar Frame86 viewsThe spacers were used to keep the rebar from coming too close to the edges of the forms. dozer
IMG_1860.jpg
Metal Spacer86 viewsA metal spacer is in place to set the position of the rebar during the walkway pour. It is good to use spacers in confined areas like this one which will not need to be walked on.dozer
IMG_1873.jpg
Walkway on Top of Septic86 viewsHere the walkway is being poured behind the house. dozer
IMG_1899.jpg
Lanko 70186 viewsThis is a high compressive strength non shrink grout which was used to top up any columns that were poured to an incorrect height.dozer
IMG_1820.jpg
Walkway86 viewsTouching up paint and creating the attic walkway. dozer
IMG_4332.jpg
Primer Second Coat86 viewsThe second coat of TOA outside primer is applied. This is one area where it doesn't pay to corner cut, although you can get by with a single coat of an inferior primer the paint job won't hold up as it will with premo paints.dozer
IMG_8585.jpg
Column Frame Mesh86 viewsThe column footing frame is 90 centimeters wide (square) and includes a top and bottom lattice. The lower frame is composed of 9mm rebar with the column frame composed of 12mm rough with 6mm connectors. dozer
mURI_temp_9a86c254.jpg
85 viewschiangmaiexpat
mURI_temp_b04ec34d.jpg
85 viewschiangmaiexpat
P4182019.JPG
18 April85 viewsMore of the gablespklongball
P5232281.JPG
23 May 200985 viewsCarpenter number 2 drilling pilot holes into the wood frame for the outside veranda trim. pklongball
P6022343.JPG
2 June85 viewsThe tile grout lady. She does about 80% of the finishing workpklongball