happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
51c68e03.jpg
roofing188 viewsbit small as mmsotis-a
081210e.jpg
haul frm homeworks88 views1 bathtub rest electribsotis-a
IMG_0452.JPG
Half the right side and back done in a day88 viewsMax&Bee-in-CM
IMG_0617.JPG
Jacking up the sagging beam88 viewsA few car jacks were used to straighten out the sagging beams, before the truss structure was welded into placeMax&Bee-in-CM
p_in_3d_rev6_7_resize.jpg
88 viewsfredlk
childrens_bath.JPG
guest bath pic, above toilet88 viewsShastadad
IMG_2191.jpg
Rendering with Sponge88 viewsA sponge is used to get the final finish on the wall.dozer
IMG_2028.jpg
Gable Covering88 viewsThe thinner shera brand fascia covering was used for the gables. dozer
IMG_8588.jpg
Column Holes88 viewsThe holes measure 1 meter wide and 40 centimeters deep. dozer
IMG_9286.jpg
Plastered and Taped ceiling88 viewsTape is applied to the joints and plastered into place. The screws are counter sunk and then plastered, as standard during ceiling installation. dozer
012.JPG
guest bath shower door finished88 viewsShastadad
2012-03-17_28429~0.jpg
88 views1 commentsEbenezer
7141 files on 596 page(s) 231

Debug Info 
Debug Output: show / hide