23 May 200988 viewsAnother one of the paint crew up on the back roof and starting the gable finishing.pklongball
|
|

2 June88 viewsLooking from the kitchen door to the front door and the tile folks finishing their workpklongball
|
|

June 2888 viewsHere is a view of the JCB loading the small dump truck with the junk dirt and other construction debris and weeds.pklongball
|
|

Jan.28,201088 viewsThe crew came back in the morning of day 2 to begin the drilling. It will take one day to drill down about 20 meters or so into the soft dirt, sand and gravel.pklongball
|
|

Jan.27,201088 viewsThe opening in the wall was just barely big enough for the rig.pklongball
|
|

Jan.29,201088 viewsDay two the crew was now drilling into the granite about 25 meters down.pklongball
|
|

88 viewsPre-cast concrete sub-floor goiing in.rucus7
|
|
|

Inside the rebar column88 viewsLooking down inside the rebar and the concrete column.Max&Bee-in-CM
|
|

View from the entrance corridor88 viewsStanding just inside the entrance, on the left is the master bedroom.Max&Bee-in-CM
|
|
|

Glass block shower stall wall # 288 viewsrucus7
|
|