|
Most viewed |
This is the type of house we are going to build450 viewstrehanse
|
|
|
447 viewsThis shows the relative size of the large cinderblocks along with the crushed stone aggregate that will be used in concrete within every other hole of the blocks. The walls thus created will be load bearing walls, every other hole will be filled with 12mm metal rebar and concrete to make the embedded support columns.
dozer
|
|
446 viewsWorking on the columns for the entrance. Weatherboard now fitted to the roof.Thaifu T
|
|
|
|
|
444 viewsPre-stressed floor slabs for the first floor are being delivered direct from the factoryRick B
|
|
The process have started443 viewstrehanse
|
|
443 viewsFirst floor beams are ready for the floor slabs (pan peun)Rick B
|
|
External From Front Left443 viewsThe roof is a 28% angle. This particular house will be 84 square meters inside, although it looks bigger.dozer
|
|
Side Deck Roof442 viewsWork on the side deck roof support steel is now underway. This roof will also extend to the rear of the house to cover the outdoor Thai kitchen.Rick B
|
|
7141 files on 596 page(s) |
|
|
|
|
|
23 | |
|
|
|
|
|
|
|