Most viewed |
21 May89 viewsThis is a view that you don't see every day. Sparky is up on our pole and he is adding some steel brackets and U bolts to secure the PVC and the PE pipe to the pole. He asked me if I wanted this and I of course said yes. This type of thing will also be used under the house in the crawl space where the PE comes up from the trench and goes to the load center conduit under the floor.pklongball
|
|
31 May89 viewsThe kitchen floor is about 80 percentpklongball
|
|
89 viewslast of the driveway concretegeordie
|
|
89 viewsa three meter truck i did when i had nearly finished find a six meter for next timegeordie
|
|
June 1289 viewsNow the second bath floor is almost finished. Just some grout work to do.pklongball
|
|
June 2889 viewsHere is the first load of gravel that will line the driveway. I am expecting two trucks for sure and maybe a third. The dirt man will decide if the 3rd is needed when he levels it and compacts it.pklongball
|
|
|
Jan.27,201089 viewsOnce in place then the set up of the rig beginspklongball
|
|
|
Jan.29,201089 viewsThe water,sand, granite that was coming out of the bore. Almost finishedpklongball
|
|
Jan.29,201089 viewsThe mess was everywherepklongball
|
|
Water zone89 viewsThe water pump area has been setup, with the smurf installed 60 metre below ground,
and some pipes and container. Max&Bee-in-CM
|
|