P5212271.JPG
21 May89 viewsThis is a view that you don't see every day. Sparky is up on our pole and he is adding some steel brackets and U bolts to secure the PVC and the PE pipe to the pole. He asked me if I wanted this and I of course said yes. This type of thing will also be used under the house in the crawl space where the PE comes up from the trench and goes to the load center conduit under the floor.pklongball
P5312329.JPG
31 May89 viewsThe kitchen floor is about 80 percentpklongball
DPP_0042.JPG
89 viewslast of the driveway concretegeordie
DPP_0041.JPG
89 viewsa three meter truck i did when i had nearly finished find a six meter for next timegeordie
P6122397.JPG
June 1289 viewsNow the second bath floor is almost finished. Just some grout work to do.pklongball
P6282551.JPG
June 2889 viewsHere is the first load of gravel that will line the driveway. I am expecting two trucks for sure and maybe a third. The dirt man will decide if the 3rd is needed when he levels it and compacts it.pklongball
P6302573.jpg
June 3089 viewsAnother of the switchespklongball
P1272808.JPG
Jan.27,201089 viewsOnce in place then the set up of the rig beginspklongball
P1292824.JPG
Jan.29,201089 viewsWork continuespklongball
P1292822.JPG
Jan.29,201089 viewsThe water,sand, granite that was coming out of the bore. Almost finishedpklongball
P1292820.JPG
Jan.29,201089 viewsThe mess was everywherepklongball
IMG_3715.JPG
Water zone89 viewsThe water pump area has been setup, with the smurf installed 60 metre below ground,
and some pipes and container.
Max&Bee-in-CM