walls going up90 viewskeep on keeping onotis-a
|
|
septic hole & d/s fill dirt in90 viewskeeping on come rain whatever,,otis-a
|
|
blue= sanitary/ water yellow=electrical90 viewsrear viewotis-a
|
|
ready for primer90 viewsrucus7
|
|
Compacting Soil for Walkway90 viewsThe soil is compacted in the walkway which surrounds the house prior to the pour. dozer
|
|
Brooming the Wall90 viewsThe brooming is used as the final step to get the finish on the wall.dozer
|
|
Corner Weld90 viewsA corner section sitting on a column. They do eventually touch up paint all of the welds in the structure.dozer
|
|
Roof Interior90 viewsAn interior view of the roof. dozer
|
|
Kitchen Counter90 viewsThe start of the kitchen counter. The counter supports are done using red brick and cement. Note the area to the left of the worker is plumbed for the kitchen sink.dozer
|
|
Applying the Render Coat to the Counter90 viewsThe render coat is applied to the counter, with exact sizes being maintained for the cabinet door openings. Great care is applied to make sure the corners are properly squared (a sign of a good workman).dozer
|
|
Bedroom Walls90 viewsThe internal bedroom walls were constructed of red brick. Notice the horizontal ring beam (extended door lintel) which spans the entire wall. This is required due to the height of the walls (3.15 meters). Also notice the vertical beams on either side of the door frame. dozer
|
|
Entertainment Area90 viewsThe power point on the far wall includes a coaxial cable input for a TV. The doors in the rear are for the two bedrooms. The right hand door is to the bathroom. The tiles on the floor of the great room are the thicker 60 centimeter by 60 centimeter granito tiles.dozer
|
|