happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
081210d.jpg
walls going up90 viewskeep on keeping onotis-a
081210c.jpg
septic hole & d/s fill dirt in90 viewskeeping on come rain whatever,,otis-a
082910walldnBK.jpg
blue= sanitary/ water yellow=electrical90 viewsrear viewotis-a
DSC_0015.jpg
ready for primer90 viewsrucus7
IMG_1835.jpg
Compacting Soil for Walkway90 viewsThe soil is compacted in the walkway which surrounds the house prior to the pour. dozer
IMG_2190.jpg
Brooming the Wall90 viewsThe brooming is used as the final step to get the finish on the wall.dozer
IMG_1809.jpg
Corner Weld90 viewsA corner section sitting on a column. They do eventually touch up paint all of the welds in the structure.dozer
IMG_2865.jpg
Roof Interior90 viewsAn interior view of the roof. dozer
IMG_4269.jpg
Kitchen Counter90 viewsThe start of the kitchen counter. The counter supports are done using red brick and cement. Note the area to the left of the worker is plumbed for the kitchen sink.dozer
IMG_4324.jpg
Applying the Render Coat to the Counter90 viewsThe render coat is applied to the counter, with exact sizes being maintained for the cabinet door openings. Great care is applied to make sure the corners are properly squared (a sign of a good workman).dozer
IMG_8963.jpg
Bedroom Walls90 viewsThe internal bedroom walls were constructed of red brick. Notice the horizontal ring beam (extended door lintel) which spans the entire wall. This is required due to the height of the walls (3.15 meters). Also notice the vertical beams on either side of the door frame. dozer
IMG_9783.jpg
Entertainment Area90 viewsThe power point on the far wall includes a coaxial cable input for a TV. The doors in the rear are for the two bedrooms. The right hand door is to the bathroom. The tiles on the floor of the great room are the thicker 60 centimeter by 60 centimeter granito tiles.dozer