happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
P6302561.JPG
June 3090 viewsHere we have the Electric man wiring the first of two lamp fixtures with the electronic ballasts need to light the lights.pklongball
P6302565.JPG
June 3090 viewsA little closer look at one of the down lightspklongball
P6302570.jpg
June 3090 viewsTelephone jackpklongball
P1282813.JPG
Jan.28,201090 viewsThe work is boring and dirty and leaves a big mess in the yard.pklongball
P1282812.JPG
Jan.28,201090 viewsOne man ran the operation and the second man was the "rough neck" that did all the laor of adding drilling pipe and checking the leavings coming from the bore.pklongball
T_house_March_2010_148.jpg
Living room90 viewsView from the dining room to the living room, kitchen and main entrance.
All wood work is solid teak.
verticalift
T_house_March_2010_177.jpg
Stairs90 viewsThe original stairs were the standard concrete type with a small storage area underneath. I had the concrete stairs "blasted-out" and installed a steel beam with steel supports for the 4cm thick teak steps. With the house orientated to take advantage of the North-East / South-West monsoon winds, there is a Venturi effect in this part of the house with the wind blowing through it.
Who needs air-con...? Plan to install a skylight overtop of the stairwell.
verticalift
DSC_0729.jpg
90 viewsPre-cast concrete sub- floorrucus7
IMG_3064.JPG
clean water90 viewswe have clean water, after a day of muddy waterMax&Bee-in-CM
DSC_0844.jpg
frame for roof90 viewsrucus7
IMG_5142.JPG
Ready for install90 viewsWaiting to be installed into placeMax&Bee-in-CM
IMG_5461.JPG
Pouring concrete90 viewsIt comes fast out of the truckMax&Bee-in-CM
7141 files on 596 page(s) 224

Debug Info 
Debug Output: show / hide