15 April90 viewsLooking up at the gable vent work in progress. This one is over the front entry area.pklongball
29 April90 viewsHere we have the stairman working on the back veranda stairway. First was a concrete pad. Now the first course of brick to build the first step.pklongball
18 May90 viewsThis part of the trench heads to the house under the foundation wallpklongball
19 May90 viewsHere we have Sparky just starting to feed the 4 conductor NYY cable into the PE pipe. The 16mm2 cable is 65 meters long and very heavy.pklongball
19 may90 viewsSparky started feeding in the NYY cable and his helper was under the house pulling it. After about 15 meters the cable stopped and his mate was almost spent trying to pull the cable alone. Sparky enlisted the help of the tile installers. In this view tile man 1 is helping to feed cable and tile man 2 went under the house to help pull.pklongball
90 viewsalmost there last of the driveway concretegeordie
June 1290 viewsAnother inside view of the second bath and the floor and now partially built vanity for the sink.pklongball