happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
IMG_1913.jpg
Level Layer93 viewsA level layer of cement mixed with sand is laid to ensure the block laying start on a level surface. Notice the clear leveling line. It is never assumed that the floor is perfectly level. dozer
IMG_1924.jpg
Adhesive93 viewsA adhesive is used to fix the horizontal pieces of 6 mm rebar in the column. This rebar is fitted into holes drilled into the column and it extends into the first block next to the column to avoid separation problems. dozer
IMG_2132.jpg
Lifting Tiles into Place93 viewsThe tile guys are lifting the tiles into place and setting them on the battens. dozer
IMG_2297.jpg
Bird Guard93 viewsThe bird guard is installed on the inside of the fascia board.dozer
IMG_4478.jpg
Grouting the Glass Blocks93 viewsThe glass blocks are grouted using a colored premium grout (bacteria resistant) applied using a plastic bag as a application tube.dozer
IMG_4728.jpg
Bathroom Terrazzo Counter93 viewsThe nearly finished bathroom terrazzo counter. Terrazzo counter or floors can be done with various colorations (achived by adding a pigment with white portland cement) and stones (sizes and colors).dozer
IMG_4867.jpg
Water Tank Lid93 viewsThe water tank lid was poured concrete around a rebar frame. dozer
IMG_9177.jpg
Ridges Laid in Place93 viewsThe ridge tiles are laid in place over a waterproofed (via Sika) concrete mix. Note that the exposed concrete will still need to be treated with a exterior coat of waterproofing agent. The other method is dry tech, which is not used here. dozer
DSC00073.jpg
93 viewsThe vertical supporting rebar structure has be wired on. The height of the structure depends on the roof height of the house. For this house the posts are 3.5 meters tall (above ground) for an overall height of 4.5 meters.dozer
IM000721.jpg
yard92 viewssomdet
mURI_temp_b1f6b7ad.jpg
92 viewschiangmaiexpat
PICT8264_(Medium).JPG
92 viewszappa
7141 files on 596 page(s) 217