Level Layer93 viewsA level layer of cement mixed with sand is laid to ensure the block laying start on a level surface. Notice the clear leveling line. It is never assumed that the floor is perfectly level. dozer
|
|
Adhesive93 viewsA adhesive is used to fix the horizontal pieces of 6 mm rebar in the column. This rebar is fitted into holes drilled into the column and it extends into the first block next to the column to avoid separation problems. dozer
|
|
Lifting Tiles into Place93 viewsThe tile guys are lifting the tiles into place and setting them on the battens. dozer
|
|
Bird Guard93 viewsThe bird guard is installed on the inside of the fascia board.dozer
|
|
Grouting the Glass Blocks93 viewsThe glass blocks are grouted using a colored premium grout (bacteria resistant) applied using a plastic bag as a application tube.dozer
|
|
Bathroom Terrazzo Counter93 viewsThe nearly finished bathroom terrazzo counter. Terrazzo counter or floors can be done with various colorations (achived by adding a pigment with white portland cement) and stones (sizes and colors).dozer
|
|
Water Tank Lid93 viewsThe water tank lid was poured concrete around a rebar frame. dozer
|
|
Ridges Laid in Place93 viewsThe ridge tiles are laid in place over a waterproofed (via Sika) concrete mix. Note that the exposed concrete will still need to be treated with a exterior coat of waterproofing agent. The other method is dry tech, which is not used here. dozer
|
|
93 viewsThe vertical supporting rebar structure has be wired on. The height of the structure depends on the roof height of the house. For this house the posts are 3.5 meters tall (above ground) for an overall height of 4.5 meters.dozer
|
|
|
|
|