18 April93 viewsIf you take a close look here you can see the crew has started adding the insect net and the Sherawood to the gable/eaves now after they built the wood vents.pklongball
|
|
5 May93 viewsHere we have one of the 2 half walls that will create the wet and dry areas for the master bath shower and toilet. This was just built in the last day or so.pklongball
|
|
8 May93 viewsHere we have Sparky number 2 getting a length of flex conduit ready for install.pklongball
|
|
19 May93 viewsIn this shot Sparky is guiding the pull rope into the PE pipe. They started with a pull wire/cable and attached a pulling rope and attached this to the NYY cable.pklongball
|
|
93 viewsjust love the scaffoldgeordie
|
|
93 viewsfront sun area nearly donegeordie
|
|
June 1593 viewsThe tile crew is working outside today getting the walk ready to apply the sand wash. We decided on not using tile herepklongball
|
|
June 2293 viewsMaster bath vanity with the Homewood doors in place and almost completepklongball
|
|
June 3093 viewsOne of the many switches used in our house. I have 3 different types. Single, 2-way and 3-way for different light control purposespklongball
|
|
11 October93 viewsLonger shot showing another 100 plus meters yet to be donepklongball
|
|
|
Switch for the Smurf93 viewsA simple switch is setup for the smurf (submersible pump).Max&Bee-in-CM
|
|