|
Most viewed |
Drywall framing installation97 viewsrucus7
|
|
Weird contraption97 viewsThis weird looking thing was holding up part of the sagging roofMax&Bee-in-CM
|
|
Master Bedroom Door97 viewsView of the wall adjoining the main area, from the master bedroom.Mishark
|
|
Laser Level97 viewsChecking the layout with a laser level which shoots a beam straight ahead and also at a 90 degree angle as well as vertical. dozer
|
|
Prefab Valley Material97 viewsThis is the chang prefabricated valley material as installed in a roof valley (shown from the inside). dozer
|
|
Kitchen Counter97 viewsThe surface of the counter is applied with freshly mixed concrete (portland cement with addition of sand and small stone aggregate). The hole to the left is where the stainless steel sink will sit and the tube extruding from the counter is for the faucet.dozer
|
|
Archway Support97 viewsThe start of the archway support structure. There will be concrete poured in forms above the archway which is supported by a rebar framework welded to the roofing metal.dozer
|
|
Terrazzo Counter Polishing97 viewsA wet polish is done after the concrete has cured an adequate amount of time. Terrazzo takes an extended period of time and work hours to install.dozer
|
|
Caulk Application to Counter Inserts97 viewsHere caulk is being applied to the joint between the wood counter door inserts and the inside of the opening. dozer
|
|
Front from Right97 viewsDesigned for ease in parking with a large drive way parking area. The street level being at 0, the garden is +5, parking +10, patio +25, house +30 centimeters. dozer
|
|
Shower Enclosure97 viewsThe water heater is a better quality Siebel® model. The enclosure has glass blocks (opaque) for a light and open feel. dozer
|
|
|
7141 files on 596 page(s) |
|
|
|
|
|
207 | |
|
|
|
|
|
|
|