Most viewed |
Front Driveway Pour98 viewsThe front driveway pour. dozer
|
|
Bathroom98 viewsThe shower enclosure is designed to have many light sources, external and in the partitioning wall. The two tier ceiling with down lights adds a nice touch. dozer
|
|
Front from left98 viewsColumns have stone facing. The overhang around the house is 1 meter. The roof angle is 28%.dozer
|
|
Concrete Samples for Compressive Test98 viewsThe floor and foundation are poured using CPAC 280 steng (which equates to 280 ksc or 280 kilograms per square centimeter of compressive stregth). The slump is 12 - 14 centimeters which is on the dry side for extra strength. The samples will be further analyzed at the factory and a report certification sent. dozer
|
|
Ring Beam98 viewsA ring beam is run horizontally around the entire structure below the window openings. Here we see the beam frame work in place. dozer
|
|
Poured Footing98 viewsThe poured footing. The footings are poured and then the ground beam is tied into place around the footing structure. dozer
|
|
CPAC Monier Roof Tiles98 viewsThe CPAC Monier roof tiles being laid in place. These tiles are basically dummy proof, except at the valley and ridges. dozer
|
|
Out of the Kitchen98 viewsWalking out of the kitchen to the front room. Notice on the right the power point mounted above the counter. Each power point has either 4 sockets or 3 sockets and utility plug for cable or telephone. There are nine power points located in the inside of the house.dozer
|
|
|
|
97 viewsawaiting doors and windowsgeordie
|
|
97 viewsremovin overfill under old housegeordie
|
|