|
Most viewed |

The metal work formed99 viewsThe metal work that goes in the pit to support the columns, proper name for this will come to me later today. LOLchangnoi
|
|

Jan.30,201099 viewsOnce it's all connected the boys made a quick test to be sure the pump would operate and ran it to see how much flow we had. They ran the pump a good 30 minutes with no shortage of water.pklongball
|
|

perimeter beam99 viewstying rebar for perimeter beamrucus7
|
|

Master bedroom99 viewsAnther view of the master bedroom rebar ground beam, being held up by a stick as we didnt get enough soil infill.Max&Bee-in-CM
|
|

Levelling99 viewsthe level thing is my second favorite tool, even the Thai workers at site started using it more often.Max&Bee-in-CM
|
|
|

99 viewssoon to be ready for ceramic tilerucus7
|
|

bedroom ceiling drywall framing99 viewsrucus7
|
|

floor tile installation99 viewsrucus7
|
|
|
|

More on Column Forms99 viewsThe column form work continues to be assembled. dozer
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
202 |  |
 |
 |
 |
|

|
|
|