happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
IMG_0066.JPG
The metal work formed99 viewsThe metal work that goes in the pit to support the columns, proper name for this will come to me later today. LOLchangnoi
P1302830.JPG
Jan.30,201099 viewsOnce it's all connected the boys made a quick test to be sure the pump would operate and ran it to see how much flow we had. They ran the pump a good 30 minutes with no shortage of water.pklongball
DSC_0635.jpg
perimeter beam99 viewstying rebar for perimeter beamrucus7
IMG_5035.JPG
Master bedroom99 viewsAnther view of the master bedroom rebar ground beam, being held up by a stick as we didnt get enough soil infill.Max&Bee-in-CM
IMG_5669.JPG
Levelling99 viewsthe level thing is my second favorite tool, even the Thai workers at site started using it more often.Max&Bee-in-CM
IMG_5764.JPG
Form-molds removed99 viewsMax&Bee-in-CM
DSC_0936.jpg
99 viewssoon to be ready for ceramic tilerucus7
DSC_0971.jpg
bedroom ceiling drywall framing99 viewsrucus7
DSC_0014.jpg
floor tile installation99 viewsrucus7
IMG_9985.JPG
Strengthening of the roof begins99 viewsMax&Bee-in-CM
SDC14305_resize.JPG
99 viewsShastadad
IMG_1711.jpg
More on Column Forms99 viewsThe column form work continues to be assembled. dozer
7141 files on 596 page(s) 202

Debug Info 
Debug Output: show / hide