Floor Level100 viewsThe ultimate target floor level is indicated by the prepoured concrete cone in the middle of the picture. Once the CPAC is poured this provides a reference for the leveling process. Note that the finished poured floor is not exactly level, the ultimate leveling occurs during the laying of the ceramic floor tiles. dozer
IMG_8986.jpg
Properly Installed Bird Stop100 viewsThis bird stop has about the right clearance, a snug fit is required or otherwise you will get unwanted entry points. dozer
IMG_9595.jpg
Roof Inspection100 viewsDon't fool yourself into thinking CPAC roof tiles are totally dummy proof. Leaks often occur at the ridge lines and valleys. A inspection during a rain cycle ensures compliance. This roof had no leaks, hurray!dozer
IMG_9273.jpg
Drywall Gypsum Board100 viewsThe sheets are screwed into the c lie suspension rails. dozer
IMG_9258.jpg
External Soffit Supports100 viewsThe c lie suspension rails are used to support the heavy nature board (Shera brand) soffit.dozer
DSC00014.jpg
100 viewsThis is the land plot after some fill dirt has been brought in (to the left of the truck). It is 84 square wah. (01-Jan-04) dozer
P1000774.jpg
100 viewsthailazer
DSCF1153_(Medium).jpg
99 viewszappa
DPP_0031.JPG
99 viewsthe team geordie
P6302569.jpg
June 3099 viewsThe Panasonic receptacles used in our housepklongball
P7092604.JPG
July 999 viewsLong shot of the panel and the connection phase. All connections will be made and tested before he calls for the final inspection and the meter installpklongball
14.JPG
99 viewsrmambour999