First few holes101 viewsThe first hole is dug, followed quickly by 2 moreMax&Bee-in-CM
|
|
|
Builders setting up their on-site living quarters101 viewsMishark
|
|
Terrazzo Counter Troweling101 viewsThe dry concrete mix (with added natural pigment for coloration) is hand troweled into place. This requires experienced guys who know how to add just enough water (which is sprinkled on top of the dry concrete mix so it can be worked) and apply pressure to work out the air bubbles.dozer
|
|
A/C Installation101 viewsThe A/C unit during installation. Note the electrics are not surface mounted (the are in the wall as with other fixtures) and on the outside the main compressor is wall mounted so as not to take up any ground space and minimize the connection distance. This is a 13000 BTU unit which can cool the master bedroom + great room.dozer
|
|
Rust Painted Weld101 viewsAfter a few days of raw welds any good team will automatically paint the welds. Just a point of procedure to verify. dozer
|
|
Girls' bathroom100 viewsA view of the tile in the girls' bathroom.somdet
|
|
Perspective 2100 viewsColoring will follow to original colors.pskog
|
|
looking south east/ish100 viewsagain, i've not had the ground fill, as this'll be the pool.mikey3073
|
|
|
Cooling it in the shade100 views6 Jan 09 Almost lunch time----"Come and get it!!"pklongball
|
|
15 April100 viewsAgain looking up we can see a couple workers adding some more of the finish wood to one of the bigger gable vent areas.pklongball
|
|