11 October102 viewsThis view of the new landscaping is from the back yard along the side to the front. This sod was laid about 3 to 6 days ago. Had great rain the last couple of days to keep it wet.pklongball
|
|
|
Jan.30,2010102 viewsDay 3 they crew came back with the Franklin 1 hp pump and control, the automatic pressure switch and several lengths of blue PVC. They wired up the pump and attached the blue pvc in 4 meter lengths and dropped the pump down the hole. pklongball
|
|
Pouring the columns102 viewsI am only looking , not workingrucus7
|
|
First delivery of cement102 viewsThe first delivery of rebar and some concrete mix to site.
The "macro" is in the background ready to dig.Max&Bee-in-CM
|
|
Waiting for mum and dad102 viewsThe kids of the Myanmar workers wait for their parents to finish work.Max&Bee-in-CM
|
|
Front right corner102 viewsLooking at the front right of the house, from the study room to the master bedroom.Max&Bee-in-CM
|
|
|
Red brick and glass block install102 viewsrucus7
|
|
|
Column Layout102 viewsThe boards on the outside of the building area are for attaching the layout lines which indicate the positions of each footing/column. dozer
|
|
Perimeter Wall Openings102 viewsThe perimeter wall decorative openings as per the plan. These have light fixtures int he top of the opening for a nice touch in the evenings.dozer
|
|