Rebar on top of Plastic103 viewsThere is a piece of rebar which holds the welded rebar mesh in place until the floor is poured. It will be lifted into place during the floor pour (positioned half way in the floor). dozer
|
|
Tiling the Great Room103 viewsTiling in process. There are different tiles used in the kitchen, great room and bedrooms. The tile is laid over a concrete slurry mix and leveled using straight lines.dozer
|
|
Natural Stone Trim Finishing103 viewsHere the natural stone trim is sanded to remove any residual cement dust or other dis colorants. Notice how the trim was applied to the columns, vertically and each vertical row is at a staggered offset. A nice touch to a column. dozer
|
|
Ceiling Structure103 viewsThe C Lie suspension rails used are the heavier grade and are spaced at about 60 centimeters by 1 meter intervals. Note the tiered ceiling section on the left side (to support the two levels of ceiling structure).dozer
|
|
Perspective 1102 viewsColoring will follow to original colors.pskog
|
|
|
102 viewsfront of house now with doorgeordie
|
|
June 8102 viewsI will not say I was reaching for the moon here just giving a perspective as to how high the ceiling is in relation to my six feet plus outstreched armpklongball
|
|
June 12102 viewsToday's view of the back of the house and the new guttering around the veranda eaves. Once it is painted it will almost be invisiblepklongball
|
|
|
July 7102 viewsThe out door fan unit now in placepklongball
|
|
11 October102 viewsAnother view of the new grasspklongball
|
|