IMG_4548.jpg
Terrazzo Counter104 viewsThis shows the raw dry concrete mixture (using a porland white cement + fine aggregate stones) being laid on top of the counter surface. It is important to not have too wet a mixture for strength of the finished counter top.dozer
IMG_4677.jpg
Soffit Caulking104 viewsThe soffit underside is caulked to fill in any irregular gaps. Notice the use of plastic before the soffit painting begins. For some reason Thai workers don't like to use any kind of masking material as a preventative, it takes continued perseverance to get it to happen.dozer
IMG_4673.jpg
Terrazzo Counter Slurry Coat104 viewsAs one of the final steps in the terrazzo counter, a slurry coat is applied. This fills in any voids in the finished surface.dozer
IMG_9774.jpg
Front of House104 viewsThe columns at the side of the driveway are made from the large size decorative bricks with a poured concrete center. There are lights controllable from a two way switch which run across the front perimeter wall. The driveway is plenty large enough for a pickup truck. dozer
IM000722.jpg
sod103 viewssomdet
13052008209a.jpg
entrance103 viewslooking east/ishmikey3073
mURI_temp_1493053d.jpg
103 viewschiangmaiexpat
locatie_nieuw_huis.jpg
103 viewslocation of the home yust oposite the airport of nakhon phanomsjeng
Fardig_gjutning_PICT8343_(Medium).JPG
103 viewszappa
P5112221.JPG
11 May103 viewsA not to close view of the newly installed cabling for the 3-phase hookup we will have in a month or two. Sparky called in the local PEA inspector to look over the house wiring and it just so happens that this guy also moonlights installing pre-meter install wiring. So now we have this covered and when the main connect is need we already have his approval so one step closer to having power.pklongball
P5112220.JPG
11 May103 viewsA more distant shot of the cabling installed for the 3 phase power and meter. The closer pole is the pole we installed for our connection. The pole opposite is the project installed pole. We had to have the cabling and pvc installed to get ready for the new meter in a month or two.pklongball
DPP_0040.JPG
103 viewsa better view of what i had to work around the house was suposed to have gone befor i got theregeordie