Spacers in Walkway106 viewsPreparing for the walk way pour around the exterior of the house. Although they are placing spacers they don't really work well for a floor pour as the rebar gets stepped on and bends. Here they are using 6mm rebar and wiring it together as opposed to the prefab welded rebar mesh. dozer
IMG_1742.jpg
Vibrating the Column Pour106 viewsThe vibrator is used during the column pour to ensure minimum voids in the completed column.dozer
IMG_4870.jpg
Bathroom nearing completion106 viewsNote the raised elevation water heater and the decorative glass blocks. The water heater was selected because it is more durable than the adjustable water warmer types, it is a Seimens brand. The warm/cold water is mixed at the faucet. dozer
IMG_8727.jpg
Floor + Ground Beam Pour106 viewsThe concrete being poured also has a water proofer as a double protective factor to ensure the damp course. The ground beams and floor is being poured. The floor pour is 10 - 12 centimeters. dozer
IMG_8875.jpg
Raw Weld106 viewsA raw (prior to rust painting) weld. The 3.2 mm thick electrode rods are used (as opposed to the 2.6 mm variety) for a heavy duty weld. All welds should be inspected when ever possible. dozer
IM000732.jpg
sod105 viewssomdet
P4182016.JPG
18 April105 viewsYesterday and today the carpentry crew was hard at it installing the front entry door frame and now the wall team is busy building the block around the door area. pklongball
P5082192.JPG
8 May105 viewsOne of the many boxes in the ceiling area that has several junctions.pklongball
P5182233.JPG
18 May105 viewsA view of the trench looking back to the streetpklongball
DPP_0030.JPG
105 viewskitchengeordie
P6302577.JPG
June 30105 viewsOne of the RCBO breakers for the load centerpklongball
10.JPG
105 viewsrmambour999