Spacers in Walkway106 viewsPreparing for the walk way pour around the exterior of the house. Although they are placing spacers they don't really work well for a floor pour as the rebar gets stepped on and bends. Here they are using 6mm rebar and wiring it together as opposed to the prefab welded rebar mesh. dozer
|
|
Vibrating the Column Pour106 viewsThe vibrator is used during the column pour to ensure minimum voids in the completed column.dozer
|
|
Bathroom nearing completion106 viewsNote the raised elevation water heater and the decorative glass blocks. The water heater was selected because it is more durable than the adjustable water warmer types, it is a Seimens brand. The warm/cold water is mixed at the faucet. dozer
|
|
Floor + Ground Beam Pour106 viewsThe concrete being poured also has a water proofer as a double protective factor to ensure the damp course. The ground beams and floor is being poured. The floor pour is 10 - 12 centimeters. dozer
|
|
Raw Weld106 viewsA raw (prior to rust painting) weld. The 3.2 mm thick electrode rods are used (as opposed to the 2.6 mm variety) for a heavy duty weld. All welds should be inspected when ever possible. dozer
|
|
|
18 April105 viewsYesterday and today the carpentry crew was hard at it installing the front entry door frame and now the wall team is busy building the block around the door area. pklongball
|
|
8 May105 viewsOne of the many boxes in the ceiling area that has several junctions.pklongball
|
|
18 May105 viewsA view of the trench looking back to the streetpklongball
|
|
|
June 30105 viewsOne of the RCBO breakers for the load centerpklongball
|
|
|