Patio107 viewsThe patio was poured 5 cm lower than the normal floor. Note that the ground beam on the outside of the patio was lowered by 5 cm. dozer
Squaring a Beam107 viewsThe window opening is squared using a straight edge tool. dozer
Duct Work for Exhaust Venting107 viewsThere are two exhaust vents one from the kitchen and one from the bathroom. This shows the ductwork used. The vent facing fits in the soffit framework.dozer
1 April106 viewsLiving room widow rough opening with the first coat of cement on it.pklongball
8 May106 viewsThe beginning of the final wiring for the load centerpklongball
8 May106 viewsI climbed up a tall ladder today to inspect the wiring and stuff from close up. Here is one view of the raceway now with some wire.pklongball
20 May106 viewsHere we can see the finished PE pipe that has 2 phone cables. One will be active and the second a backup pair.pklongball