|
Most viewed |
27 October110 viewsA long view of the walking pathwaypklongball
|
|
Rented formwork110 viewsWe rented it, not sure how much yet, will get the bill when we finish, but should be no more than 5,000 baht.Max&Bee-in-CM
|
|
110 viewsnot ready to paintrucus7
|
|
final completion estimate110 viewsit = 1.5mm tbotis-a
|
|
|
Front door, from inside110 viewsMishark
|
|
Floor Level110 viewsThe wood stakes indicate the level of the floor pour. The rebar being used is the prefab rebar mesh (that comes in a roll) type typically used in flooring. dozer
|
|
Formwork Assembly110 viewsThe metal forms are clipped into place using u bolts. They are rented at a daily rate depending with a price for each piece used. dozer
|
|
Edge Tiles Replaced110 viewsThe edge tiles are replaced here without excess space between the tile edge and the fascia board. dozer
|
|
|
lookinf north east/ish109 viewsthe house you can see is my wifes auntie, we gave her that old house off our plot, and she's erected it there so they can stay there when they pick the rice, otherwise it'll be empty.mikey3073
|
|
|
7141 files on 596 page(s) |
|
|
|
|
|
183 | |
|
|
|
|
|
|
|