9 May 2009112 viewsSparky and Sparky 2 have now prewired most of the house. The ceiling lights over the main entry and veranda are shown herepklongball
|
|
2 June112 viewsHere we are on another day and now the pump room crew is busy bending 12mm rebar for the beams for the walls and floorpklongball
|
|
July 6112 viewsDouble width pad area for the two compressorspklongball
|
|
white pine coated112 viewsafter 4 coats of 1/1/1 tung oil, mineral spirits, and beeswaxthaimic
|
|
|
Column Formwork112 viewsThe formwork for the support column on top of the footing is done using cinder blocks which will stay in place after the pour. dozer
|
|
Floor112 viewsThe floor after the pour. The surface is rough broomed to prepare it for the tile. dozer
|
|
Form Work for Lintel112 viewsThe form work for a lintel/ring beam. There are U shaped pieces of 12 mm rebar used to ensure that the forms don't spread out when the concrete is poured. dozer
|
|
Attic View112 viewsNote that the electric is in conduit that throughout the project. Also there is a view of one of the exhaust fans.dozer
|
|
Hip Roof Structure112 viewsThe raw hip roof structure. The key members are the 3.2 mm thick steel with intermediate sections done in the 2.0 mm thick steel. Box sections are used throughout, no C sections. dozer
|
|