9 May 2009112 viewsSparky and Sparky 2 have now prewired most of the house. The ceiling lights over the main entry and veranda are shown herepklongball
P6022332.JPG
2 June112 viewsHere we are on another day and now the pump room crew is busy bending 12mm rebar for the beams for the walls and floorpklongball
P7062587.JPG
July 6112 viewsDouble width pad area for the two compressorspklongball
pine_door_4_cts_a.JPG
white pine coated112 viewsafter 4 coats of 1/1/1 tung oil, mineral spirits, and beeswaxthaimic
Picture_10.png
Teeland First Floor Layout112 viewsthailazer
IMG_1418.jpg
Column Formwork112 viewsThe formwork for the support column on top of the footing is done using cinder blocks which will stay in place after the pour. dozer
IMG_1630.jpg
Floor112 viewsThe floor after the pour. The surface is rough broomed to prepare it for the tile. dozer
IMG_2003.jpg
Form Work for Lintel112 viewsThe form work for a lintel/ring beam. There are U shaped pieces of 12 mm rebar used to ensure that the forms don't spread out when the concrete is poured. dozer
IMG_4875.jpg
Attic View112 viewsNote that the electric is in conduit that throughout the project. Also there is a view of one of the exhaust fans.dozer
IMG_8847.jpg
Hip Roof Structure112 viewsThe raw hip roof structure. The key members are the 3.2 mm thick steel with intermediate sections done in the 2.0 mm thick steel. Box sections are used throughout, no C sections. dozer