happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
P7102615.JPG
July 10114 viewsThe bathroom vanity and the new 4 lamp halogen fixture.pklongball
19.JPG
114 viewsrmambour999
P7212640.JPG
July 21114 viewsSB Furniture in Rayong delivered and set up our nice entertainment unit. They were neat and professional.pklongball
IMG_0588_-_Sagging.jpg
The metal beams begin to sag under the weight of the tiles114 viewsMax&Bee-in-CM
IMG_1430.JPG
Installing the side roof tiles114 viewsMax&Bee-in-CM
DSC01149.JPG
114 viewsMishark
Front_Door.JPG
Front door, from outside114 viewsMishark
IMG_1284.jpg
Excavating a Footing114 viewsThe cinder blocks will be used as formwork for the footing. dozer
IMG_4615.jpg
Walkway Concrete Pour114 viewsDuring the walkway concrete pour. The walkways are done with concrete with a added natural pigment for coloration. Notice the blue PVC water line sitting under the rebar mesh. The front plastic cover is to a prefabricated grease trap which sits between the kitchen sink and the dirty water septic.dozer
IM000731.jpg
rain water urns113 viewsWe will use these for drining water supply. I"ll fill them from two large urns behind the house which will be connected to the rain gutters.somdet
mURI_temp_660e7d14.jpg
113 viewschiangmaiexpat
P3261939.JPG
26 March 2009113 viewsAnd now it's time for the door frames. This one is being set in for the kitchen door to the back patiopklongball
7141 files on 596 page(s) 178

Debug Info 
Debug Output: show / hide