happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
P7212644.JPG
July 21115 viewsFour days to move in day and the bedroom builtin cabinets are just arriving. It will take all of the next 4 days to get them installed.pklongball
PB272710.JPG
27 October115 viewsView from the pump house walk to the new walk to get to the house. pklongball
DSC_1012.jpg
insulation115 viewsrucus7
SupportBarsUp.jpg
115 viewsMishark
MinorBathrooms.JPG
Small bathroom outside wall and glass tiles115 viewsMishark
IMG_1443.jpg
Bathroom Lowered115 viewsThe beam for the bathroom was lowered by 5 cm corresponding with the step down. dozer
IMG_9769.jpg
Proper Leveling of Toilet115 viewsThe toilet being check for level during installation.dozer
P1121653.JPG
12 Jan 2009114 viewsAll footing holes now filled and the work starts to build the form work for the floor support beams.pklongball
P1121654.JPG
12 Jan 2009114 viewsCloser view of the work on the formspklongball
P4282049.JPG
28 April114 viewsA look at some of the metal stringers and grid used to prepare for the gypsum ceiling around the eaves.pklongball
DPP_0025.JPG
114 viewsmum in law bedroom with own toilet and shower through doorgeordie
P6282548.JPG
June 28114 viewsUnderside of the roof with the now complete tile roofingpklongball
7141 files on 596 page(s) 177

Debug Info 
Debug Output: show / hide