happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
IMG_1479.jpg
Form work for Ground Beam117 viewsStarting the form work for the ground beam. On the inside it will be cinder block and on the other side it will be form wood (which is removed after the pour).dozer
IMG_1481.jpg
Spacer Production117 viewsThe spacers are small rounds of concrete with embedded wire in them. The wire allows the spacers to be tied onto the desired element. There are two sizes used in this build, 3cm (on the side of beam) and 5cm (under footing/beam).dozer
IMG_4718.jpg
Aluminum Windows + Door Material117 viewsThe aluminum windows and door material. These are custom made according to the measure done by the manufacturers. These are the thicker white aluminum material. dozer
IMG_0932a.jpg
Carpet in Master Bedroom117 viewsThis carpet before removal.dozer
20160318_170702.jpg
117 viewsIrishBuilder
Panorama_1.jpg
Panorama 1116 viewsColoring will follow to original colors.pskog
IM000734.jpg
sod at end of day 1116 viewssomdet
mURI_temp_9a69236a.jpg
116 viewschiangmaiexpat
P5082190.JPG
8 May116 viewsMore wire. In order to have light and cooling, wire is necessary and it can be very confusing.pklongball
DPP_0058.JPG
116 viewsthat wall use to be two meters high the drain is grey water with a 4" pipe through to the road for monsoon drainage on both sides of the housegeordie
P6282528.JPG
June 28116 viewsThe roof is almost ready for the tilepklongball
P6302582.JPG
June 30116 viewsNow we have the kitchen lights installed and ready for powerpklongball
7141 files on 596 page(s) 175

Debug Info 
Debug Output: show / hide