28 April124 viewsWe have some work starting on the gypsum ceiling. The crew came in today and started outside.pklongball
|
|
2 June124 viewsA little closer look at the junction of the beam rebar to the upright columnspklongball
|
|
2 June124 viewsA worm's eye view of the rebar cage for the beampklongball
|
|
July 9124 viewsNow we get to the main panel and Sparky's wiring notes. Did he get all the connections correct>? By the time I posted this photo Sparky has made all the connections and installed all the breakers and tested a few of the lighting circuits.pklongball
|
|
Red brick early on.124 viewsrucus7
|
|
The beginning (hut before)124 viewsMishark
|
|
CPAC concrete delivery124 viewsMishark
|
|
Poured Support Column124 viewsA poured support column (the part of the column under the floor). The guide lines are visible which indicate where the middle of each column should be. dozer
|
|
View from the Kitchen124 viewsThe view from the kitchen looking towards the entry door. The sink is an under mount stainless sink. The ceiling has two tiers, with decorative wood trim accenting the lower inside corner. The row of down lights along the outside is controlled by two individual dimmer switches. dozer
|
|
Windows123 viewsAll of the windows are aluminum. They slide open from both sides.somdet
|
|
Shredded coconut hulls123 viewsI have been trying to find wood chips for ages, always to no avail. I found these at 30 baht a bag and am very happy about it! I love mulch!!!somdet
|
|
The Crew123 views5 Jan 09 A view of the crew getting things ready for the first pourpklongball
|
|