Staking out the floorplan138 viewsWife and I decided to test our floorplan by staking and strings. This was at least 2 months before hole dig.
Oct.'08pklongball
|
|
Finding the correct position138 views5 Jan 09 We have a column man setting one of the rebar columns into place and making some position adjustments to locate it over the centering stake.pklongball
|
|
Day 21 Starting to form the lower column138 views6 Jan 09 Another view of the form workpklongball
|
|
Two storey house138 viewszappa
|
|
June 12138 viewsColumn rendering and the partial counter and cabinet built in the back. This cabinet will house the gas bottles, storage and a shoe rackpklongball
|
|
Footing Frame138 viewsThe footing frame in place with 5 cm. spacers on the bottom and the upright rebar indicating the center of the footing. dozer
|
|
Electric for Perimeter Wall Lighting138 viewsThe perimeter wall lighting electric is routed via the edge of the driveway up through the front column above the wall. dozer
|
|
Soffit Finish138 viewsThe exterior soffit finishing with the attractive 2" composite slats, much nicer + more expensive than the flat panels. There are two exhaust fans exit face plates attached to the soffit.dozer
|
|
Shower Enclosure Upper Edge138 viewsThe upper edge of the shower enclosure, grout being applied.dozer
|
|
|
4 Jan 09 Site visit137 viewsJust another view of the piles of rebar cages trucked in todaypklongball
|
|