|
Most viewed |
|
Dec. 4th142 viewsAnother view of the front yard with the new grass and treespklongball
|
|
Close up Glass Block Work142 viewsThis close up shows the glass blocks in the great room and the recessed ceiling lighting. The recessed lighting is controlled by 3 dimmer switches.dozer
|
|
eaves141 viewsHere is a shot of the eaves that have been sheetrocked.somdet
|
|
view of the corridor in the big room 2-09-08141 viewskornoipaddy
|
|
Column marking continues141 views16 Dec.'08pklongball
|
|
Trenching machine141 views10 Jan 2009 This is the trenching machine. One man, one pick and no shoes.pklongball
|
|
|
4 April141 viewsAnd now the back left corner view showing us the long roof valley that was done very well in my opinion. The tile fitter spent a lot of time cutting the tile to get a good tight, straight line down this valley.pklongball
|
|
15 April141 viewsThis is the last day of Songkran and we actually have 6 or 7 workers on site. Three of them are now adding the wood work to the gables and in this view the vents are being built.pklongball
|
|
|
5 May141 viewsToday they finished the second trench down the side from the septic tank to the street drain. I hope tomorrow the pipe will be installed.pklongball
|
|
7141 files on 596 page(s) |
|
|
|
|
|
148 | |
|
|
|
|
|
|
|