External Render143 viewsThe aerated blocks again use a specific product for the external render. It is a ready mix cement skim coat type product. It is easy to work and makes for a smooth and nice render finish. The final thickness of the walls will be 12.5 centimeters so this is being applied about 2.5 centimeters on each side. dozer
Revarinished wood and laid new section.143 viewsWoodwork on the large mirror assembly.dozer
Refinished wood Eves143 viewsThe wood eves were sanded and refinished.dozer
Krisida Condo Building142 viewsThe Condo is located between the beach and Sukhumvit highway about 20 km south of Pattaya. It is in a adjacent to a quiet town known for excellent sea food restraunts -- Ban Amphur. Just about 15 minutes to downtown Pattaya by Taxi or motorcycle.MsDozer
Doors142 viewsThe door to the master bedroom.somdet
Connection to old house142 viewsRibbed bars glued with special glue to the old house foundation.
This is done to every beam what is connected to the old structure.pskog
Rebarman 3142 views4 Jan 09 Placing the supports under the rebar cagepklongball
Front & North view142 viewsView of the front and north elevation of the house when we had to return home last year.bngldsmth
21 Feb 2009142 viewsThese two workers are getting the mix ready to finish pouring the side stepspklongball
5 May142 viewsThis part of the living room ceiling shows the 30 cm step from the lower to higher ceiling. The larger 30cm step was decided to allow install of the ceiling aircon unit later.pklongball
142 viewsmy wife located the sat dish when i was outgeordie